Billings Jackson Design
  • News
  • Projects
  • Team
  • About
  • Contact
  • BJD and China
  • Transport & Urban
  • Lighting & Controls
  • Furniture
  • Healthcare
  • Wayfinding
  • Architectural Detail
  • All Projects
  • Zurich Light Rail System
  • NYC Coordinated Street Furniture
  • NYC Bus Bulb Remediation
  • Line 1 Street Furniture
  • Line 2 Street Furniture
  • Zurich Airport Signage
  • Times Square Pedestrian Bridge
  • Bilbao Bus Station
  • Crossrail Line-wide Components
  • Brooklyn NY SBS Stations
  • Times Square Redesign
  • Hudson Square Redesign

Zurich Light Rail System

Kai Flender Architects 2008

Billings Jackson Design worked with Kai Flender Architects to develop a station concept for the new light rail system – the Glattalbahn - for the urban Glatt valley area, which runs from the north of Zurich to the airport. Phase two of the construction programme is now approaching completion.

The design comprises a platform, shelter and balustrade system for the trains and passengers and a bicycle storage device to be located near by. The shelter is designed to create a pleasant ‘window’ in which to sit, and a comfortable, warm lit area for waiting. A unitised system allows the integration of ticket machines and signage.

The stations are being built by Swiss firm Burri, which is a specialist in public elements from street furniture to signage and lighting. Billings Jackson collaborated with Burri previously on the illuminated signage for the new airside and landside centres at Zurich Airport, designed by Grimshaw.

The rail system is critical to the current intensive development of the Glatt region because Swiss planning regulations link commercial and residential development to the availability of public transport. Added to this, the airport is a key employer for the city and a retail destination in its own right.

The Glattalbahn’s three-phase programme began in 2004 and, when complete in 2010, 21 stations will have been built. The light rail system is funded by a consortium of local and regional transport authorities and is fully compatible with the existing Zurich tram system. It is estimated that on completion, between 3,000 and 5,000 people per hour could use the system.

glattalbahn 300IMG 3682IMG 3699IMG 3668IMG 3938IMG 3741IMG 3770Glattal sketch small